Posts Are Coming Soon
Stay tuned...
Over the past few weeks I got in and started the rebuild. The new cabinet/mitre saw station consisted of 4 bottom cabinets with pull out draws and slides.
With the Cases in positioned the bench top was in stalled and the Mitre Saw placed in it's position
.
Next was the Draws, Slides and the middle Cabinets.
The Mitre Saw cabinet is in operations.
Next part will be the draw fronts and the finishing touches
Thinking about doing a top section of cabinets / Pigeon Holes for the Power tools.